Top News

Hillsborough Bridge construction update for May 22

<span>The P.E.I. Department of Transportation and Infrastructure Renewal is currently doing studies on the Hillsborough Bridge structure to see if there is capacity to widen it to include individual cycling lanes. <br /></span>
Work continues on the Hillsborough Bridge - SaltWire File Photo
CHARLOTTETOWN, P.E.I. —

The Park Street access to and from Riverside Drive will be closed from 6 a.m. to 4 p.m. on Friday, May 22. This closure is required to allow the installation of a pipe bore as part of the Stratford sewer line project.
 

Through traffic on Park Street will not be permitted during this closure. Local access only for residents and business will be permitted from Kensington Road.

Drivers are reminded that this area is a construction zone and traffic controls will be in place as work continues on the additional phases of the Stratford sewer line.

RELATED:

Did this story inform or enhance your perspective on this subject?
1 being least likely, and 10 being most likely

Recent Stories