SUMMERSIDE, P.E.I. — Crews will be installing an overhead sign structure on Route 2 immediately east of the Granville Street roundabout on Sunday.
Work is expected to occur between the hours 6 and 11 a.m. Traffic will be stopped on Route 2 for about 15 minutes while the crane lifts and places the sign structure over the road. No traffic will be permitted through the site while the structure is being hoisted into place.
Overhead sign being installed at Summerside area roundabout Sunday morning
STORY CONTINUES BELOW THESE SALTWIRE VIDEOS